Parking Lot Installation - Toronto

This installation is at Billy Bishop Airport in downtown Toronto, the problem was minimal space for the car wash and  the amount of underground wiring in the area. The building in the background is the control tower, so plenty of concern.

Pavement installs are easy, cut the footprint of the building plus 2' all round for the SM frost protection. Remove the pavement and add gravel if needed and compact so the footprint is level. Install 2" Shiplap SM and tape it.

Install drains, oil separator, electrical, level and square the form, take pictures for Off-Site inspection certificate, pour.